China Go Kart Chain Tools Quotes - SHD1000 Plastic Pipe Fusion Welding Machine – Lechuang

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our mission is usually to turn into an innovative provider of high-tech digital and communication devices by providing worth added design and style, world-class producing, and repair capabilities for Plastic Pipe Welding Machine Price, Hdpe Pipe Fitting Welding Machine, Hdpe Pipe Cutter, To significantly improve our service quality, our company imports a large number of foreign advanced devices. Welcome clients from home and abroad to call and inquire!
China Go Kart Chain Tools Quotes - SHD1000 Plastic Pipe Fusion Welding Machine – Lechuang Detail:

Description

SHD1000 HDPE PIPE welding machine is suitable for welding PE PP PPR plastic pipe, and welding range from DN710mm to DN1000mm. It is widely used to Agricultural, chemical, oil and gas pipelines, water supply pipes, drainage pipes etc.

Features

1. The raw material of the machine frame is aluminum ZL104, it is light but strong, is one of  the best material for machine.

2. The main electrical apparatus elements are best of china, many are imported from abroads.

3. Removable PTFE coated heater with separate temperature control system, the temperature can be controlled to a minimum range.

4. The electric facer adopts reversible double cutting edge blades, which can make the cutting effect more perfect.

Optional Parts

Stub end holder, Crane ,data logger etc.

Specification

Model

SHD1000

Welding range(mm)

710mm–800mm–900mm–1000mm

Heating plate temperature

270°C

Heating plate surface 
temperature(170-250°C)

<±10°C

Pressure adjustment range

0-18MPa

Cross-sectional area of the cylinder

2512mm²

Working Voltage

380V,50Hz

Heating plate power

21.7KW

Cutter power

3.0KW

Hydraulic station power

3.0KW

Service

1. Any inquiries will be replied within 24 hours.

2. Professional manufacturer.

3. OEM is available.

4. High quality, standard designs,reasonable&competitive price, fast lead time.

Working Photos

c101
c102

FAQ

Q: Are you trading company or manufacturer?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 2-3 days if the machines are in stock. If big worshop fitting machine or special machine, it will take about 15-30 days.

Q: Can you design and produce special machines according to customer requirement?
A: Yes, we have strong technical capacity, can develop any new products by ourselves totally.

Packing and Delivery

ccc2


Product detail pictures:

China Go Kart Chain Tools Quotes - SHD1000 Plastic Pipe Fusion Welding Machine – Lechuang detail pictures

China Go Kart Chain Tools Quotes - SHD1000 Plastic Pipe Fusion Welding Machine – Lechuang detail pictures

China Go Kart Chain Tools Quotes - SHD1000 Plastic Pipe Fusion Welding Machine – Lechuang detail pictures

China Go Kart Chain Tools Quotes - SHD1000 Plastic Pipe Fusion Welding Machine – Lechuang detail pictures

China Go Kart Chain Tools Quotes - SHD1000 Plastic Pipe Fusion Welding Machine – Lechuang detail pictures

China Go Kart Chain Tools Quotes - SHD1000 Plastic Pipe Fusion Welding Machine – Lechuang detail pictures


Related Product Guide:

Sticking to the perception of "Creating products of top of the range and earning mates with people today from all over the world", we constantly put the desire of consumers in the first place for China Go Kart Chain Tools Quotes - SHD1000 Plastic Pipe Fusion Welding Machine – Lechuang , The product will supply to all over the world, such as: Anguilla, Lyon, Bahrain, we are now looking forward to even greater cooperation with overseas customers based on mutual benefits. We will work wholeheartedly to improve our products and services. We also promise to work jointly with business partners to elevate our cooperation to a higher level and share success together. Warmly welcome you to visit our factory sincerely.
  • The goods are very perfect and the company sales manager is warmful, we will come to this company to purchase next time.
    5 Stars By Renee from Melbourne - 2017.09.30 16:36
    Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
    5 Stars By Charlotte from Italy - 2017.05.02 18:28
    Write your message here and send it to us